Shape Roofing Currie Street
Shape called on Pinnacle Access Group to carry out a comprehensive maintenance and repair project at 77 Currie street.
Myer Cladding
Shape called on Pinnacle Access Group to carry out a comprehensive maintenance and repair project at MYER centre.
Botanical Garden
Roofing & Cladding called on Pinnacle Access Group to carry out a comprehensive maintenance and repair project at High School.
Woomera (Steel remediation)
Duratec called on Pinnacle to cut and remove an existing steel elbow acting as an overflow for the water storage tanks.
Torrens Island (Stack Inspection)
AGL relied on Pinnacle to help with inspection and remediation on this project. The stacks are of high profile serving the energy industry.
Marriott Hotel (Glazing)
Micos called on Pinnacle Access Group to carry out High rise Glazing at the 5 star hotel project under construction by Besix Watpac.
Adelaide Oval (Camera installation)
Spider Cam called on Pinnacle Access Group to facilitate a complex camera installation at South Australia's iconic sporting facility the Adelaide Oval.
Altitude Apartments (Inspection, facade remediation and NDT)
Duratec worked with Pinnacle to help with inspections and facade remediation on this project at Altitude Apartments.
1 King William Rd (Mast-climber)
Pinnacle Access Group were engaged by Sky Reach to provide installation & removal of 4 x twin mast climbers at 1 King William, Adelaide, to provide access for a full facade upgrade.
60 King William Rd (Sign installation)
Image Group called on Pinnacle Access Group to install the telstra sign at the new government precinct 60 King William Rd.
BHP Building (Pipe welding)
Jennings Plumbing engaged Pinnacle to help with the emergency night works on the BHP Building.
Town Hall
Duratec came to Pinnacle, requiring access for the heritage facade upgrade at Adelaide's iconic Town Hall.