Shape Roofing Currie Street
Shape called on Pinnacle Access Group to carry out a comprehensive maintenance and repair project at 77 Currie street.
Myer Cladding
Shape called on Pinnacle Access Group to carry out a comprehensive maintenance and repair project at MYER centre.
Botanical Garden
Roofing & Cladding called on Pinnacle Access Group to carry out a comprehensive maintenance and repair project at High School.
Woomera (Steel remediation)
Duratec called on Pinnacle to cut and remove an existing steel elbow acting as an overflow for the water storage tanks.
Torrens Island (Stack Inspection)
AGL relied on Pinnacle to help with inspection and remediation on this project. The stacks are of high profile serving the energy industry.
Marriott Hotel (Glazing)
Micos called on Pinnacle Access Group to carry out High rise Glazing at the 5 star hotel project under construction by Besix Watpac.
1 King William Rd (Mast-climber)
Pinnacle Access Group were engaged by Sky Reach to provide installation & removal of 4 x twin mast climbers at 1 King William, Adelaide, to provide access for a full facade upgrade.
Town Hall
Duratec came to Pinnacle, requiring access for the heritage facade upgrade at Adelaide's iconic Town Hall.
Roma Mitchell
Pinnacle were engaged by Sky Reach to provide installation & removal of 4 mast climbers at 136 North Terrace, Adelaide. The access was for a full facade upgrade and mast-climbers were the safest, most cost-effective way to work at height on this large scale project.
Grenfell Centre
Pinnacle Access Group were engaged by Sky Reach to provide installation & removal of 4 x twin mast climbers at 25 Grenfell st Adelaide, to provide access for a full facade upgrade
ECH Encore Apartments
Sarah constructions called on Pinnacle Scaffolding SA to meet the challenges of their unusual work site at the ECH Encore Apartments in Modbury
Mc Kinnon Parade
Duratec came to Pinnacle, requiring edge protection for a 10 story residential building in North Adelaide